The following report, submitted by Atlantic Engineering on Oct. 26, 2015, documents the current condition of the Grenfell Campus pool and outlines recommended remedial measures and associated costs for implementing those measures. Note that the probable cost listed in the report does not include the full scope of the project with respect to total rehabilitation of the pool (floor/wall finishes, HVAC system, electrical/lighting, filtration system) that would be required to return the pool to full functionality.
The second document, a supplementary professional opinion letter from Atlantic Engineering, suggests a timeframe for the pool closure that will ensure the health and safety of users and stems from the findings contained in the report.